Displayed to two decimal places.
PERSON · STARLIGHT
Zaha Hadid
Recorded name: 扎哈·哈迪德
Zaha Hadid was an architect whose work included cultural venues, transport facilities, office buildings, and residences.
Original Chinese introduction
扎哈·哈迪德是建筑师,作品涵盖文化场馆、交通设施、办公与住宅建筑。
Starting from competition drawings and unbuilt schemes, Hadid developed tilting forms, curved surfaces, and continuous spaces into a distinctive architectural language. With her practice and engineering teams, she completed projects including the Vitra Fire Station, MAXXI Museum, London Aquatics Centre, and SOHO developments, and she also worked in furniture and product design.
Original Chinese context
哈迪德从竞赛绘图与未建方案出发,将倾斜、曲面和连续空间发展为鲜明的建筑语言。她与事务所及工程团队合作完成维特拉消防站、MAXXI博物馆、伦敦水上运动中心和SOHO等项目,也从事家具与产品设计。
- Zaha Hadid Foundation biography and project timeline ↗Original Chinese label · Zaha Hadid Foundation生平与项目时间线
- Vitra Fire Station project page ↗Original Chinese label · Vitra消防站项目页
- ZHA practice history ↗Original Chinese label · ZHA事务所历史
Derived from the current score.
Contribution groups assessed so far; coverage is still being expanded.
ASSESSMENT SCOPEWhat this score covers
All included contribution titles and notes are available in English. The complete original text remains available in Chinese; both editions use the same scores and source links.
Uncovered contributions and unresolved harms are not treated as zero. This is not a complete assessment of a lifetime.
5 included contributions have incomplete evidence; the relevant gap appears with that contribution.
Original scope note
This research record currently includes 5 outcomes within a limited scope; M and attribution shares are revisable judgments. Uncovered content and negative effects not yet clarified are not treated as zero; specific gaps appear in the item-by-item explanations.
Original Chinese scope
本轮当前已列5项有限研究账;M与归功份额为可修订判断。未覆盖内容和未核清的负面作用不按零处理,具体缺口见逐项说明。
CALCULATIONHow the score is calculated
Q = 10^(M/2) − 1; Lᵢ = aᵢ × Qᵢ; L = Σ Lᵢ; S = 2 × log₁₀(1 + L).
M is an outcome’s assessed magnitude and a is the person’s allocated share. A standalone score is only a per-item reference; the attributed light from distinct contributions is what can be combined.
SCORE DETAILS
5 evaluated contributions
M is the assessed magnitude of an outcome; attribution is the person’s share of credit. Attributed light can be added. The standalone score is only a per-item reference and must not be added across rows.
Scroll sideways for scores and attribution.
| Outcome | M | Attribution share | Attributed light | Standalone score | Share of total | Status |
|---|---|---|---|---|---|---|
| 01Early competition drawings and the design language of unbuilt architectural projects早期竞赛图纸与未建建筑设计语言OUT-SL0668-1979-1992-EARLY-UNBUILT-DESIGN-LANGUAGE · After 1979 and before completion of the first building | 5.5 | 48% | 269.443836 | 4.86 | 25.8939% | Provisional estimate · incomplete evidence |
| 02A family of science, museum, and civic-cultural architectural works科学、博物馆与城市文化建筑作品族OUT-SL0668-1998-2014-CULTURAL-SCIENCE-CIVIC-BUILDINGS · Late twentieth to early twenty-first century | 6.1 | 22% | 246.624060 | 4.79 | 23.7008% | Provisional estimate · incomplete evidence |
| 03A family of sports, transport, and infrastructure architectural works体育、交通与基础设施建筑作品族OUT-SL0668-2001-2014-SPORTS-TRANSPORT-INFRASTRUCTURE · Early twenty-first century | 5.9 | 20% | 178.050188 | 4.51 | 17.1108% | Provisional estimate · incomplete evidence |
| 04A family of office, commercial, and residential architectural works办公、商业与住宅建筑作品族OUT-SL0668-2001-2016-OFFICE-COMMERCIAL-RESIDENTIAL-BUILDINGS · Designed during her lifetime, partly completed posthumously | 5.9 | 20% | 178.050188 | 4.51 | 17.1108% | Provisional estimate · incomplete evidence |
| 05Vitra Fire Station, the first completed workVitra消防站首座建成作品OUT-SL0668-1991-1993-VITRA-FIRE-STATION · 1991–1993 | 5.5 | 30% | 168.402398 | 4.46 | 16.1837% | Provisional estimate · incomplete evidence |
On small screens, scroll this table horizontally to reach every numeric column.
NOTES AND SOURCES
Contribution notes and source links
English translations of the included notes appear below, with their Chinese originals available for comparison.
01Early competition drawings and the design language of unbuilt architectural projects早期竞赛图纸与未建建筑设计语言OUT-SL0668-1979-1992-EARLY-UNBUILT-DESIGN-LANGUAGE
Record yearAfter 1979 and before completion of the first building
Original Chinese · record year
1979年后、首座建筑建成前
summaryDeveloped an architectural design language open to public discussion through fragmentation, tilting, continuous fields, and painterly representation.
Original Chinese · summary
以碎裂、倾斜、连续场域和绘画式表现形成可公开讨论的建筑设计语言。
M rationaleThe design texts reach an independent visual and architectural argumentative endpoint and can be assessed even when unbuilt; their public-use value is limited and lower than that of the mature building family.
Original Chinese · M rationale
设计文本有独立视觉与建筑论证终态,即使未建仍可估;其公共使用价值有限,低于成熟建筑族。
attribution rationaleZaha Hadid .48; the early ZHA design team .20; the prehistory of the AA and avant-garde architecture .17; competition, client, and exhibition teams .07; unresolved share .08. The shares are revisable research judgments.
Original Chinese · attribution rationale
扎哈·哈迪德 .48;ZHA早期设计团队 .20;AA与先锋建筑前史 .17;竞赛、客户与展览团队 .07;未解析份额 .08。份额为可修订的研究判断。
overlap boundaryCounts major competition drawings, models, and unbuilt schemes from the founding of the practice in 1979 until the first completed building as design texts; does not replicate M for each scheme and does not claim realized building performance.
Original Chinese · overlap boundary
计1979创办事务所后至首座建成建筑前的主要竞赛图纸、模型和未建方案作为设计文本;不按每个方案复制M,也不声称已实现建筑性能。
Evidence gapsCompetition texts for key early unbuilt projects have not been read individually; design responsibility remains summarized through the practice’s own account
Original Chinese · evidence gaps
初期关键未建项目未逐项读取竞赛文本;设计责任仍由事务所自述概括
Full attribution budget
Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.
- .48Zaha HadidOriginal Chinese · 扎哈·哈迪德Person
- .20Early ZHA design teamOriginal Chinese · ZHA早期设计团队Team
- .17Prehistory of the AA and avant-garde architectureOriginal Chinese · AA与先锋建筑前史Predecessor pool
- .07Competition, client, and exhibition teamsOriginal Chinese · 竞赛、客户与展览团队Team
- .08Unresolved shareOriginal Chinese · 未解析份额Unallocated
Source links
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
02A family of science, museum, and civic-cultural architectural works科学、博物馆与城市文化建筑作品族OUT-SL0668-1998-2014-CULTURAL-SCIENCE-CIVIC-BUILDINGS
Record yearLate twentieth to early twenty-first century
Original Chinese · record year
二十世纪末至二十一世纪初
summaryOrganizes diverse public cultural spaces through continuous surfaces, fluid spaces, and extensions of the urban ground plane.
Original Chinese · summary
以连续曲面、流线空间和城市地面延展组织多类公共文化空间。
M rationaleIt spans multiple large public buildings with a clear spatial increment, reaching the scale of an important family of architectural works; functional and political limitations reduce M.
Original Chinese · M rationale
跨多座大型公共建筑且有清晰空间增量,达到重要建筑作品族量级;功能与政治局限压缩M。
attribution rationaleZaha Hadid .22; ZHA project architects and design team .28; client, curatorial, and functional-planning team .14; engineering, construction, and contracting team .24; the prehistory of museums, science centers, and public buildings .07; unresolved share .05. The shares are revisable research judgments.
Original Chinese · attribution rationale
扎哈·哈迪德 .22;ZHA项目建筑师与设计团队 .28;客户、策展与功能规划团队 .14;工程、施工与承包团队 .24;博物馆、科学中心与公共建筑前史 .07;未解析份额 .05。份额为可修订的研究判断。
overlap boundaryCombines Phaeno, MAXXI, Heydar Aliyev Centre, Dongdaemun, and other science, museum, and urban-cultural buildings; treats each as a mutually exclusive work set and does not separately replicate M for individual projects.
Original Chinese · overlap boundary
合并Phaeno、MAXXI、Heydar Aliyev Centre、Dongdaemun等科学、博物馆和城市文化建筑;每座作为互斥作品集合,不再按型号单独复制M。
Evidence gapsIndependent post-occupancy evaluations and carbon costs for each project are lacking; client sources do not support a claim of universal public benefit
Original Chinese · evidence gaps
缺各项目独立使用后评价和碳成本;客户来源不支持普遍公共受益
Full attribution budget
Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.
- .22Zaha HadidOriginal Chinese · 扎哈·哈迪德Person
- .28ZHA project architects and design teamOriginal Chinese · ZHA项目建筑师与设计团队Team
- .14Client, curatorial, and functional-planning teamOriginal Chinese · 客户、策展与功能规划团队Team
- .24Engineering, construction, and contracting teamOriginal Chinese · 工程、施工与承包团队Team
- .07Prehistory of museums, science centers, and public buildingsOriginal Chinese · 博物馆、科学中心与公共建筑前史Predecessor pool
- .05Unresolved shareOriginal Chinese · 未解析份额Unallocated
Source links
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
03A family of sports, transport, and infrastructure architectural works体育、交通与基础设施建筑作品族OUT-SL0668-2001-2014-SPORTS-TRANSPORT-INFRASTRUCTURE
Record yearEarly twenty-first century
Original Chinese · record year
二十一世纪初
summaryResponds to sporting and transport functions through dynamic structures, continuous circulation lines, and iconic public spaces.
Original Chinese · summary
以动态结构、连续流线与标志性公共空间回应运动和交通功能。
M rationaleIt has practical endpoints across multiple projects and is distinct in type from museums, but cost, function, and team dependence make M slightly lower than for the cultural-building family.
Original Chinese · M rationale
多项目实用终态且类型区别于博物馆,但成本、功能与团队依赖使M略低于文化建筑族。
attribution rationaleZaha Hadid .20; ZHA infrastructure design team .27; sports and transport clients and operations team .15; engineering, construction, and contracting team .26; prehistory of sports and transport architecture .07; unresolved share .05. The shares are revisable research judgments.
Original Chinese · attribution rationale
扎哈·哈迪德 .20;ZHA基础设施设计团队 .27;体育与交通客户及运营团队 .15;工程、施工与承包团队 .26;体育与交通建筑前史 .07;未解析份额 .05。份额为可修订的研究判断。
overlap boundaryCombines the architectural endpoints of the Bergisel Ski Jump, London Aquatics Centre, and major transport facilities listed in the timeline; does not claim event results, urban tourism, or the full M of each site.
Original Chinese · overlap boundary
合并Bergisel Ski Jump、London Aquatics Centre及时间线所列主要交通设施的建筑终态;不领取赛事结果、城市旅游或每个站点的完整M。
Evidence gapsThe specific list and commissioning dates of transport projects have not been determined one by one; operational and accessibility data are lacking
Original Chinese · evidence gaps
交通项目具体清单和投入使用日期未逐项核定;缺运营和无障碍数据
Full attribution budget
Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.
- .20Zaha HadidOriginal Chinese · 扎哈·哈迪德Person
- .27ZHA infrastructure design teamOriginal Chinese · ZHA基础设施设计团队Team
- .15Sports and transport clients and operations teamOriginal Chinese · 体育与交通客户及运营团队Team
- .26Engineering, construction, and contracting teamOriginal Chinese · 工程、施工与承包团队Team
- .07Prehistory of sports and transport architectureOriginal Chinese · 体育与交通建筑前史Predecessor pool
- .05Unresolved shareOriginal Chinese · 未解析份额Unallocated
Source links
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
04A family of office, commercial, and residential architectural works办公、商业与住宅建筑作品族OUT-SL0668-2001-2016-OFFICE-COMMERCIAL-RESIDENTIAL-BUILDINGS
Record yearDesigned during her lifetime, partly completed posthumously
Original Chinese · record year
生前设计、部分身后建成
summaryApplies continuous circulation lines, through-running atria, bridging spaces, and topographic masses to production communication, commercial pedestrian movement, office combinations, and special residential commissions, creating use endpoints distinct from cultural venues and transport facilities.
Original Chinese · summary
把连续流线、贯通中庭、桥接空间和地形化体量应用到生产沟通、商业步行、办公组合与特殊住宅委托,形成不同于文化场馆和交通设施的使用终态。
M rationaleThis family covers distinct built endpoints in production offices, commercial offices, and residences; its functional scope and engineering realization are independent of the public-cultural and sports-transport families. Private commissions, commercial exclusivity, and limitations in operational evidence reduce M; it receives no increment for project count or awards.
Original Chinese · M rationale
该族覆盖生产办公、商业办公与住宅的不同建成终态,功能范围和工程实现独立于公共文化、体育交通族;其私人委托、商业排他性和运营证据局限压入M,不以项目数量或奖项加分。
attribution rationaleZaha Hadid .20; Patrik Schumacher .08; ZHA office, commercial, and residential design team .22; client and functional-planning team .13; engineering, construction, and contracting team .25; prehistory of office, commercial, and residential architecture .07; unresolved share .05. The shares are revisable research judgments.
Original Chinese · attribution rationale
扎哈·哈迪德 .20;帕特里克·舒马赫 .08;ZHA办公商业住宅设计团队 .22;客户与功能规划团队 .13;工程、施工与承包团队 .25;办公、商业与住宅建筑前史 .07;未解析份额 .05。份额为可修订的研究判断。
overlap boundaryCounts office, commercial, and residential works such as BMW Leipzig Central Building, Galaxy SOHO, Wangjing SOHO, and Capital Hill Residence that Hadid led during her lifetime and the practice realized; residences are limited to the evidenced Capital Hill case, and projects designed solely by successor teams after 2016 are excluded.
Original Chinese · overlap boundary
计Hadid生前主导并由事务所落实的BMW Leipzig Central Building、Galaxy SOHO、Wangjing SOHO及Capital Hill Residence等办公、商业与住宅作品;住宅以有据的Capital Hill个案为限,2016年后纯由后继团队设计的项目不纳入。
Evidence gapsIn this round, Wangjing SOHO was located only through the practice archive catalogue, without reading its individual project technical page; Capital Hill was finally completed after Hadid’s death, and the shares of lifetime design and successor implementation have not been closed stage by stage; independent operational, carbon, maintenance, and labor materials are lacking; this round’s attempt to retrieve the BMW project PDF encountered a site error; the previously read source location is retained, and the project’s precise start and end dates are not presented as reviewed facts.
Original Chinese · evidence gaps
Wangjing SOHO本轮仅由事务所档案目录定位,未逐读独立项目技术页;Capital Hill最终完成于Hadid逝世后,生前设计与后继实施份额尚未逐阶段闭合;缺独立运营、碳、维护与劳动资料;本轮复取BMW项目PDF遇到站点错误;保留此前读取定位,项目精确起止日期不作为已复核事实展示。
Full attribution budget
Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.
- .20Zaha HadidOriginal Chinese · 扎哈·哈迪德Person
- .08Patrik SchumacherOriginal Chinese · 帕特里克·舒马赫Person
- .22ZHA office, commercial, and residential design teamOriginal Chinese · ZHA办公商业住宅设计团队Team
- .13Client and functional-planning teamOriginal Chinese · 客户与功能规划团队Team
- .25Engineering, construction, and contracting teamOriginal Chinese · 工程、施工与承包团队Team
- .07Prehistory of office, commercial, and residential architectureOriginal Chinese · 办公、商业与住宅建筑前史Predecessor pool
- .05Unresolved shareOriginal Chinese · 未解析份额Unallocated
Source links
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
05Vitra Fire Station, the first completed workVitra消防站首座建成作品OUT-SL0668-1991-1993-VITRA-FIRE-STATION
Record year1991–1993
summaryTranslated early dynamic geometry into a buildable narrow concrete space and a functional fire-station facility.
Original Chinese · summary
把早期动态几何转成可建的狭长混凝土空间与消防功能设施。
M rationaleIts scale is limited, but as the first completed work it has clear value as a methodological translation and is valued as an important individual building.
Original Chinese · M rationale
规模有限但作为首座建成作品具有明确方法转化价值,按重要单体建筑估值。
attribution rationaleZaha Hadid .30; ZHA Vitra design team .25; Vitra client and fire-brigade team .14; engineering, construction, and materials team .19; prehistory of modern fire stations and concrete architecture .07; unresolved share .05. The shares are revisable research judgments.
Original Chinese · attribution rationale
扎哈·哈迪德 .30;ZHA Vitra设计团队 .25;Vitra客户与消防队团队 .14;工程、施工与材料团队 .19;现代消防站与混凝土建筑前史 .07;未解析份额 .05。份额为可修订的研究判断。
overlap boundaryCounts only the first architectural endpoint of the Vitra Campus fire station from commission to completion in 1991–93; early language inputs are not repeated, and subsequent changes of use are not fed back in.
Original Chinese · overlap boundary
只计1991–93 Vitra Campus消防站从委托到建成的首个建筑终态;早期语言输入不重复,后续用途变化不回灌。
Evidence gapsEngineers, construction teams, and post-occupancy evaluation are lacking; company and client pages both have promotional characteristics
Original Chinese · evidence gaps
缺工程师、施工团队和使用后评价;公司与客户页面均带宣传属性
Full attribution budget
Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.
- .30Zaha HadidOriginal Chinese · 扎哈·哈迪德Person
- .25ZHA Vitra design teamOriginal Chinese · ZHA Vitra设计团队Team
- .14Vitra client and fire-brigade teamOriginal Chinese · Vitra客户与消防队团队Team
- .19Engineering, construction, and materials teamOriginal Chinese · 工程、施工与材料团队Team
- .07Prehistory of modern fire stations and concrete architectureOriginal Chinese · 现代消防站与混凝土建筑前史Predecessor pool
- .05Unresolved shareOriginal Chinese · 未解析份额Unallocated
Source links
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
- Works and institutional archives ↗Original Chinese label · 作品与机构档案
BOUNDARIES NOT COUNTED
Not included in this score
These subjects are recorded as exclusions and are not silently treated as zero or as part of the included outcomes.
Product, furniture, and exhibition design
产品、家具与展览设计
Reason A known direction, but the existing timeline is insufficient to form a mutually exclusive catalogue of major works and a team budget.
Original Chinese reason
已知方向但现有时间线不足以形成互斥主要作品目录和团队预算。
Residual teaching and practice leadership
教学与事务所领导残余
Reason The practice’s organizational labor is already included in each project budget; positions and general brand value do not receive separate positive residual credit for the practice.
Original Chinese reason
事务所组织劳动已进入各项目预算;职位和一般品牌价值不另设公司正面残余。
How to read this score
Scores can change when evidence is reviewed. The method page explains how magnitude, attribution, and included results relate to the displayed score.
Read the method in English →