PERSON · STARLIGHT

Christopher Wren

Recorded name: 克里斯托弗·雷恩

Christopher Wren was an English architect, astronomer, and mathematical researcher. After the Great Fire of London, he participated in rebuilding the city's churches and led the design of the new St Paul's Cathedral.

Original Chinese introduction

克里斯托弗·雷恩是英国建筑师、天文学家和数学研究者。伦敦大火后,他参与重建城市教堂,并主持新圣保罗大教堂的设计。

His architectural work spanned churches, university halls, hospitals, and courts. Before entering architecture, he pursued astronomical observation, instrument making, and mathematical problems.

Original Chinese context

他的建筑工作横跨教堂、大学礼堂、医院和宫廷。进入建筑事业前,他已从事天文观测、仪器制作和数学问题研究。

Introduction sources
Provisional score5.75

Displayed to two decimal places.

Score tierNova T5

Derived from the current score.

Evaluated contributions4

Contribution groups assessed so far; coverage is still being expanded.

ASSESSMENT SCOPE

What this score covers

All included contribution titles and notes are available in English. The complete original text remains available in Chinese; both editions use the same scores and source links.

Uncovered contributions and unresolved harms are not treated as zero. This is not a complete assessment of a lifetime.

4 included contributions have incomplete evidence; the relevant gap appears with that contribution.

Original scope note

This research record currently includes 4 outcomes within a limited scope; M and attribution shares are revisable judgments. Uncovered content and negative effects not yet clarified are not treated as zero; specific gaps appear in the item-by-item explanations.

Original Chinese scope

本轮当前已列4项有限研究账;M与归功份额为可修订判断。未覆盖内容和未核清的负面作用不按零处理,具体缺口见逐项说明。

Open Chinese score details →

Download the full score details (JSON, Chinese notes)

CALCULATION

How the score is calculated

Q = 10^(M/2) − 1; Lᵢ = aᵢ × Qᵢ; L = Σ Lᵢ; S = 2 × log₁₀(1 + L).

M is an outcome’s assessed magnitude and a is the person’s allocated share. A standalone score is only a per-item reference; the attributed light from distinct contributions is what can be combined.

See a simple scoring example →

SCORE DETAILS

4 evaluated contributions

M is the assessed magnitude of an outcome; attribution is the person’s share of credit. Attributed light can be added. The standalone score is only a per-item reference and must not be added across rows.

Chinese score details →

Scroll sideways for scores and attribution.

OutcomeMAttribution shareAttributed lightStandalone scoreShare of totalStatus
01The design, structure, and long-construction outcome of the new St Paul's Cathedral新圣保罗大教堂设计、结构与长期施工终态OUT-SL0763-1666-1710-ST-PAULS-CATHEDRAL-DESIGN-CONSTRUCTION · 16666.226%327.0606075.0343.7557%Provisional estimate · incomplete evidence
02A portfolio of secular public buildings and long-span structures世俗公共建筑与大跨结构作品族OUT-SL0763-1664-1718-SECULAR-INSTITUTIONAL-BUILDINGS-SPAN-ENGINEERING · 16645.725%176.7364464.5023.6447%Provisional estimate · incomplete evidence
03A portfolio of post-fire London churches and urban religious rebuilding火灾后伦敦教堂群与城市宗教建筑重建组合OUT-SL0763-1666-1718-LONDON-CITY-CHURCHES-REBUILDING · 16665.818%142.7990824.3219.1043%Provisional estimate · incomplete evidence
04Residual work in astronomical observation, lunar modeling, and mathematical experimental science天文观测、月球模型与数学实验科学残余OUT-SL0763-1654-1684-ASTRONOMY-INSTRUMENTS-MATHEMATICAL-SCIENCE · 16545.032%100.8728854.0213.4953%Provisional estimate · incomplete evidence

On small screens, scroll this table horizontally to reach every numeric column.

NOTES AND SOURCES

Contribution notes and source links

English translations of the included notes appear below, with their Chinese originals available for comparison.

01The design, structure, and long-construction outcome of the new St Paul's Cathedral新圣保罗大教堂设计、结构与长期施工终态OUT-SL0763-1666-1710-ST-PAULS-CATHEDRAL-DESIGN-CONSTRUCTION

Record year1666

summaryIntegrated the dome, longitudinal liturgical space, structure, and urban skyline within a nationally religious project of complex constraints, and delivered the physical work through office and construction organization. The architectural system of the new St Paul's after the 1666 fire, from design and office drawings to completion in 1710; other London churches, the reconstruction of the entire city, later restoration, and tourism revenue are excluded.

Original Chinese · summary

在约束复杂的国家宗教工程中整合穹顶、长轴礼仪空间、结构和城市天际线,并通过办公室与施工组织完成实体。 1666火灾后新圣保罗从方案、办公室制图到1710完成的建筑系统;伦敦其他教堂、整个城市重建、后世修复与旅游收益排除。

M rationaleThere are 226 drawings by Wren and his office and a completed built outcome; their integration of scale, structure, and function corresponds to M6.2. Do not attribute all credit for the building to one individual.

Original Chinese · M rationale

有226张Wren及办公室图纸和完成建筑终态,规模、结构与功能整合对应M6.2;不把建筑全功归个人。

attribution rationaleAttribution budget: Wren 0.26; office 0.28; construction team 0.18; project management 0.08; prior work 0.12; institutions 0.04; unresolved 0.04.

Original Chinese · attribution rationale

Wren 0.26;办公室0.28;施工团队0.18;项目管理0.08;前史0.12;机构0.04;未解析0.04。

overlap boundaryThe architectural system of the new St Paul's after the 1666 fire, from design and office drawings to completion in 1710; other London churches, the reconstruction of the entire city, later restoration, and tourism revenue are excluded.

Original Chinese · overlap boundary

1666火灾后新圣保罗从方案、办公室制图到1710完成的建筑系统;伦敦其他教堂、整个城市重建、后世修复与旅游收益排除。

Evidence gapsThe responsibilities for design and implementation require analysis drawing by drawing, together with structural advisers and site account books.

Original Chinese · evidence gaps

需逐图纸、结构顾问与工地账簿解析方案和实施责任。

Full attribution budget

Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.

  • 0.26Christopher WrenOriginal Chinese · 克里斯托弗·雷恩Person
  • 0.28WREN OFFICE DRAUGHTSMEN SURVEYORS AND DESIGN TEAM (roles specified in the attribution budget)Original Chinese · WREN OFFICE DRAUGHTSMEN SURVEYORS AND DESIGN TEAM(预算列明角色)Team
  • 0.18MASONS CARPENTERS ENGINEERS CRAFTSPEOPLE AND SITE WORKERS (roles specified in the attribution budget)Original Chinese · MASONS CARPENTERS ENGINEERS CRAFTSPEOPLE AND SITE WORKERS(预算列明角色)Team
  • 0.08CATHEDRAL COMMISSIONERS CLERGY PATRONS AND PROJECT ADMINISTRATION (roles specified in the attribution budget)Original Chinese · CATHEDRAL COMMISSIONERS CLERGY PATRONS AND PROJECT ADMINISTRATION(预算列明角色)Team
  • 0.12ROMAN RENAISSANCE BAROQUE GOTHIC DOME AND CATHEDRAL PRIOR WORK (roles specified in the attribution budget)Original Chinese · ROMAN RENAISSANCE BAROQUE GOTHIC DOME AND CATHEDRAL PREHISTORY(预算列明角色)Predecessor pool
  • 0.04ST PAULS CATHEDRAL CROWN AND CITY INSTITUTIONS (roles specified in the attribution budget)Original Chinese · ST PAULS CATHEDRAL CROWN AND CITY INSTITUTIONS(预算列明角色)Institution
  • 0.04UNRESOLVED ST PAULS ATTRIBUTION (roles specified in the attribution budget)Original Chinese · UNRESOLVED ST PAULS ATTRIBUTION(预算列明角色)Unallocated

Source links

02A portfolio of secular public buildings and long-span structures世俗公共建筑与大跨结构作品族OUT-SL0763-1664-1718-SECULAR-INSTITUTIONAL-BUILDINGS-SPAN-ENGINEERING

Record year1664

summaryAdapted classical public space to English climate and institutional functions, and achieved a ceremonial hall at the Sheldonian with an approximately 70-foot column-free roof structure. The Sheldonian Theatre's long-span column-free roof and the combined secular/institutional buildings listed by RIBA, including the Royal Hospital Chelsea, Old Royal Naval College Greenwich, and Hampton Court; churches and St Paul's are excluded.

Original Chinese · summary

将古典公共空间按英国气候和机构功能改造,并在Sheldonian以约70英尺无柱屋架实现礼仪大厅。 Sheldonian Theatre的大跨无柱屋盖及RIBA列示的Royal Hospital Chelsea、Old Royal Naval College Greenwich、Hampton Court等世俗/机构建筑组合;教堂和圣保罗排除。

M rationaleOxford architectural history provides a clear long-span technical outcome for the Sheldonian, while RIBA lists a broader institutional portfolio; M5.7 is assigned to the complementary public-buildings combination.

Original Chinese · M rationale

Oxford建筑史提供Sheldonian明确大跨技术终态,RIBA列出更宽机构作品,按互补公共建筑组合取M5.7。

attribution rationaleAttribution budget: Wren 0.25; office 0.25; construction 0.10; patrons 0.12; prior work 0.14; institutions 0.08; unresolved 0.06.

Original Chinese · attribution rationale

Wren 0.25;办公室0.25;施工0.10;委托方0.12;前史0.14;机构0.08;未解析0.06。

overlap boundaryThe Sheldonian Theatre's long-span column-free roof and the combined secular/institutional buildings listed by RIBA, including the Royal Hospital Chelsea, Old Royal Naval College Greenwich, and Hampton Court; churches and St Paul's are excluded.

Original Chinese · overlap boundary

Sheldonian Theatre的大跨无柱屋盖及RIBA列示的Royal Hospital Chelsea、Old Royal Naval College Greenwich、Hampton Court等世俗/机构建筑组合;教堂和圣保罗排除。

Evidence gapsThe specific division of work at the Royal Hospital, Greenwich, and Hampton Court has not yet been closed project by project.

Original Chinese · evidence gaps

Royal Hospital、Greenwich与Hampton Court具体分工尚未逐项目闭合。

Full attribution budget

Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.

  • 0.25Christopher WrenOriginal Chinese · 克里斯托弗·雷恩Person
  • 0.25WREN OFFICE ENGINEERS DRAUGHTSMEN AND PROJECT TEAMS (roles specified in the attribution budget)Original Chinese · WREN OFFICE ENGINEERS DRAUGHTSMEN AND PROJECT TEAMS(预算列明角色)Team
  • 0.1MASONS CARPENTERS CRAFTSPEOPLE AND CONSTRUCTION TEAMS (roles specified in the attribution budget)Original Chinese · MASONS CARPENTERS CRAFTSPEOPLE AND CONSTRUCTION TEAMS(预算列明角色)Team
  • 0.12SHELDON CROWN HOSPITAL NAVAL AND UNIVERSITY PATRONS (roles specified in the attribution budget)Original Chinese · SHELDON CROWN HOSPITAL NAVAL AND UNIVERSITY PATRONS(预算列明角色)Team
  • 0.14ROMAN THEATRE RENAISSANCE CLASSICAL AND ENGLISH STRUCTURAL PRIOR WORK (roles specified in the attribution budget)Original Chinese · ROMAN THEATRE RENAISSANCE CLASSICAL AND ENGLISH STRUCTURAL PREHISTORY(预算列明角色)Predecessor pool
  • 0.08OXFORD CROWN ROYAL HOSPITAL AND GREENWICH INSTITUTIONS (roles specified in the attribution budget)Original Chinese · OXFORD CROWN ROYAL HOSPITAL AND GREENWICH INSTITUTIONS(预算列明角色)Institution
  • 0.06UNRESOLVED WREN SECULAR PORTFOLIO ATTRIBUTION (roles specified in the attribution budget)Original Chinese · UNRESOLVED WREN SECULAR PORTFOLIO ATTRIBUTION(预算列明角色)Unallocated

Source links

03A portfolio of post-fire London churches and urban religious rebuilding火灾后伦敦教堂群与城市宗教建筑重建组合OUT-SL0763-1666-1718-LONDON-CITY-CHURCHES-REBUILDING

Record year1666

summaryDelivered differentiated worship spaces and urban landmarks across multiple constrained sites through an office system, forming portfolio-level rebuilding capacity. The post-fire London City church portfolio during Wren's tenure, including its towers, plans, and urban adaptation; St Paul's is consumed by a dedicated entry, and the unimplemented overall London plan is not counted as a physical outcome.

Original Chinese · summary

通过办公室系统在多个受限基地上交付差异化礼拜空间和城市标志,形成组合层重建能力。 Wren任内火灾后伦敦城市教堂组合及其塔楼、平面和城市适配;圣保罗由专点消费,未实施的整体伦敦规划不作实体成果。

M rationaleRIBA confirms that Wren built 53 London churches in his lifetime, but the value lies in the physical portfolio and adaptation rather than the number itself; M5.8 is assigned. The unrealized overall London plan is not counted.

Original Chinese · M rationale

RIBA确认Wren一生建53座伦敦教堂,但价值来自实体组合和适配而非数量本身,取M5.8;未实现伦敦总规划不计。

attribution rationaleAttribution budget: Wren 0.18; office 0.30; local construction 0.22; rebuilding management 0.08; prior work 0.12; institutions 0.05; unresolved 0.05.

Original Chinese · attribution rationale

Wren 0.18;办公室0.30;地方施工0.22;重建管理0.08;前史0.12;机构0.05;未解析0.05。

overlap boundaryThe post-fire London City church portfolio during Wren's tenure, including its towers, plans, and urban adaptation; St Paul's is consumed by a dedicated entry, and the unimplemented overall London plan is not counted as a physical outcome.

Original Chinese · overlap boundary

Wren任内火灾后伦敦城市教堂组合及其塔楼、平面和城市适配;圣保罗由专点消费,未实施的整体伦敦规划不作实体成果。

Evidence gapsArchitectural records for each church are needed to identify office members such as Hawksmoor and the roles of the individual parishes.

Original Chinese · evidence gaps

需逐堂建筑档案识别Hawksmoor等办公室成员和各教区角色。

Full attribution budget

Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.

  • 0.18Christopher WrenOriginal Chinese · 克里斯托弗·雷恩Person
  • 0.3WREN OFFICE ARCHITECTS DRAUGHTSMEN SURVEYORS AND CLERKS (roles specified in the attribution budget)Original Chinese · WREN OFFICE ARCHITECTS DRAUGHTSMEN SURVEYORS AND CLERKS(预算列明角色)Team
  • 0.22PARISH MASONS CARPENTERS CRAFTSPEOPLE AND SITE TEAMS (roles specified in the attribution budget)Original Chinese · PARISH MASONS CARPENTERS CRAFTSPEOPLE AND SITE TEAMS(预算列明角色)Team
  • 0.08REBUILDING COMMISSION CITY OFFICIALS AND PROJECT ADMINISTRATION (roles specified in the attribution budget)Original Chinese · REBUILDING COMMISSION CITY OFFICIALS AND PROJECT ADMINISTRATION(预算列明角色)Team
  • 0.12ENGLISH PARISH CLASSICAL BAROQUE AND URBAN CHURCH PRIOR WORK (roles specified in the attribution budget)Original Chinese · ENGLISH PARISH CLASSICAL BAROQUE AND URBAN CHURCH PREHISTORY(预算列明角色)Predecessor pool
  • 0.05CITY OF LONDON CHURCH AND CROWN INSTITUTIONS (roles specified in the attribution budget)Original Chinese · CITY OF LONDON CHURCH AND CROWN INSTITUTIONS(预算列明角色)Institution
  • 0.05UNRESOLVED WREN CITY CHURCH PORTFOLIO ATTRIBUTION (roles specified in the attribution budget)Original Chinese · UNRESOLVED WREN CITY CHURCH PORTFOLIO ATTRIBUTION(预算列明角色)Unallocated

Source links

04Residual work in astronomical observation, lunar modeling, and mathematical experimental science天文观测、月球模型与数学实验科学残余OUT-SL0763-1654-1684-ASTRONOMY-INSTRUMENTS-MATHEMATICAL-SCIENCE

Record year1654

summaryCombines precise observation, a three-dimensional lunar model, instrument delivery, and solutions to geometrical/motion problems as a set of actual scientific products. The institutionally evidenced close observation of Saturn, a lunar globe made at royal request but now lost, a donated astronomical quadrant, and the personal residual work described in Oxford's history of mathematics on geometrical problems and correct analogous solutions to elastic collisions; Royal Society posts, medical anatomy, and Newton's full proof of gravitation are excluded.

Original Chinese · summary

把精密观测、三维月面模型、仪器交付和几何/运动问题求解结合为一组实际科学产物。 有机构依据的Saturn近距观测、按皇家请求制作但已失传的月球仪、捐赠天文象限,以及Oxford数学史所述几何问题和弹性碰撞相似正确解答的个人残余;Royal Society职位、医学解剖和Newton完整引力证明排除。

M rationaleOxford institutional materials document specific observations, the lunar globe, quadrant, and mathematical/collision problems, rather than relying solely on professorial or Royal Society titles; M5.0 is assigned to a set of early scientific residuals.

Original Chinese · M rationale

Oxford机构资料给出具体观测、月球仪、象限和数学/碰撞问题,不是仅凭教授或Royal Society头衔,按一组早期科学残余取M5.0。

attribution rationaleAttribution budget: Wren 0.32; instrument/observation team 0.10; scientific circle 0.08; prior work in knowledge 0.22; institutions 0.08; unresolved 0.20.

Original Chinese · attribution rationale

Wren 0.32;仪器/观测团队0.10;科学圈0.08;知识前史0.22;机构0.08;未解析0.20。

overlap boundaryThe institutionally evidenced close observation of Saturn, a lunar globe made at royal request but now lost, a donated astronomical quadrant, and the personal residual work described in Oxford's history of mathematics on geometrical problems and correct analogous solutions to elastic collisions; Royal Society posts, medical anatomy, and Newton's full proof of gravitation are excluded.

Original Chinese · overlap boundary

有机构依据的Saturn近距观测、按皇家请求制作但已失传的月球仪、捐赠天文象限,以及Oxford数学史所述几何问题和弹性碰撞相似正确解答的个人残余;Royal Society职位、医学解剖和Newton完整引力证明排除。

Evidence gapsOriginal observational/mathematical manuscripts are needed to verify the specific independent content of the Saturn result, the lunar globe's precision, and the collision solution.

Original Chinese · evidence gaps

需原始观测/数学稿核对Saturn结果、月球仪精度和碰撞解答的具体独立内容。

Full attribution budget

Every recorded actor remains visible. Share (0–1) retains the ledger’s exact decimal value.

  • 0.32Christopher WrenOriginal Chinese · 克里斯托弗·雷恩Person
  • 0.1INSTRUMENT MAKERS OBSERVERS AND SCIENTIFIC CORRESPONDENCE TEAM (roles specified in the attribution budget)Original Chinese · INSTRUMENT MAKERS OBSERVERS AND SCIENTIFIC CORRESPONDENCE TEAM(预算列明角色)Team
  • 0.08WILKINS HOOKE WALLIS BOYLE AND OXFORD LONDON SCIENTIFIC CIRCLE (roles specified in the attribution budget)Original Chinese · WILKINS HOOKE WALLIS BOYLE AND OXFORD LONDON SCIENTIFIC CIRCLE(预算列明角色)Team
  • 0.22EUCLIDEAN APOLLONIAN KEPLERIAN GALILEAN ASTRONOMY GEOMETRY AND MECHANICS PRIOR WORK (roles specified in the attribution budget)Original Chinese · EUCLIDEAN APOLLONIAN KEPLERIAN GALILEAN ASTRONOMY GEOMETRY AND MECHANICS PREHISTORY(预算列明角色)Predecessor pool
  • 0.08OXFORD GRESHAM COLLEGE AND ROYAL SOCIETY INSTITUTIONS (roles specified in the attribution budget)Original Chinese · OXFORD GRESHAM COLLEGE AND ROYAL SOCIETY INSTITUTIONS(预算列明角色)Institution
  • 0.2UNRESOLVED WREN SCIENCE ATTRIBUTION (roles specified in the attribution budget)Original Chinese · UNRESOLVED WREN SCIENCE ATTRIBUTION(预算列明角色)Unallocated

Source links

BOUNDARIES NOT COUNTED

Not included in this score

These subjects are recorded as exclusions and are not silently treated as zero or as part of the included outcomes.

Item-by-item versions, collaboration, and later influence

逐项版本、协作和后世影响

Reason Existing sources are insufficient to settle specific attribution; attribution cannot be made automatically by the number of works or projects.

Original Chinese reason

现有来源不足以结清具体归属,不能按作品或项目数量自动归因。